Production schedule

16/4/2025

0 Comments

 
It has been 2 months since my last update. Since then, I've completed the animation and soundscape of my film. Here is how I did it:

February 17-23
  • BG 20 camera move
  • BG 8-9 lineart
  • BG 1 layout, color key, lineart, color
  • rough animation: shots 6.3, 5.7
  • sound effects from metadigger
  • Foley recording

February 24-March 2
  • rough animation: shots 5.6, 5.7, 5.1, 5.2, 6.2, 4.3
  • background layouts, colorkeys: 2, 3, 4, 7, 10, 13, 14, 15, 16, 18, 19, 20, 21

March 3-9
  • refine animation: shots 1.3, 1.6, 3.1, 3.2
  • transition from shot 5.3 to 5.4
  • backgrounds layouts: 13, 14, 15, 16, 22
  • backgrounds line art: 2, 3, 4, 5, 6, 7, 13, 14, 20, 21

March 10-16
  • animation: shot 1.4
  • bugs rough animation: shots 4.3, 6.3, 2.2, 3.1, 3.2, 5.4, 5.7
  • backgrounds line art: 15, 16, 22
  • backgrounds colored: 13, 14

March 17-23​​
  • backgrounds colored: 2, 3, 4, 5, 6, 7, 10, 11, 15, 16, 17, 18, 19
  • animation: shots 4.3, 1.5 bugs, 3.1 bugs
  • lining most of Lorraine animation (like, really, all except 8 shots)

March 24-30
  • bug animation: scene 1, 2, 3, 5 swarms​
  • redoing BG 12, and 13-14 camera move
  • updating SFX
  • shading backgrounds: 6, 12, 17

March 31-April 6
  • shading backgrounds: 7, 12, 13, 14
  • coloring in Lorraine animations
  • animating so many bugs: shots 1.2, 1.3, 1.5
  • spending a full day each on animating the bugs in shots 3.1, 3.2, 4.3, 5.4, and 6.3

April 7-13
  • adding the dots, heads, legs/wings on the bugs in shots 3.1, 3.2, and 5.4
  • finishing coloring in Lorraine
  • drawing title card and credits
  • redoing BG 20 camera move
  • re-coloring and shading final scene
  • finalizing sound effects.

In all, I spent approximately 245 hours in the WACOM lab in EV5 this semester. Sometimes I also worked from home. Once I worked in FB 325.
0 Comments

Officially in production!!!

19/2/2025

0 Comments

 
This is my basic sound effect pass. It's not well mixed at all, but I just put it together to show Emmeline all the sound effects I had in mind. I don't know how good any of this will sound with music included, but I figure that the music she's composing is the most important sonic element of the film and that if any sound effects or ambience get in its way, they can go.

I already got some feedback on this sound effect pass. And I've also already added a lot to the animation since this export. Anyway, here are the changes to be made from here:
Sound notes
  • Make car in background smaller and quieter
  • In macro bug shots, bring bug sounds a lot louder and cars way quieter
  • Van should go beep beep OR vroom vroom NOT BOTH
  • Add ambiences and sfx for farm scene, take them out later if it doesn't work with music!
  • Also, add amb throughout. If it doesn't work THEN take it out
  • In extreme macro bug shot, NO amb
  • Take out ladybug going grrrr and just have it quiet with loud wet crunch
  • Lorraines little Ah when she opens her mouth should be like 12 fr earlier
  • Add truck sounds for cityscape
  • More pronounced lick sfx
Visual notes
  • More smears thru out
  • Speed up fall. like by half a second or something
  • When Lorraine runs she should be even floppier
  • Take away car sfx right before van
  • Redraw the van as a uhaul or something, it's not clear that it's a moving truck
  • Add another second of Lorraine closeup sad intro face in mirror shot1.
  • Lorraine's mouth should quiver exaggeratedly in bathroom scene
  • Lorraine's acting should be super exaggeratedly sad, brows furrowed, lips quivering etc.
Picture
Backgrounds Update
In between rough animation, I've been working on backgrounds as well. There are two camera moves in the whole 2 minutes, and I've animated both in separate TvPaint projects.
​I've also started adding nicer linework and basic color (no shading yet) to backgrounds (cafe and bathroom). Just to work on something easier than animating and get a feeling of reward.
I really don't like this background so far but I have plans to fix it.
  • vary the shades of blue
  • calm down the damn green and red
  • more shading in just blues
Picture
0 Comments

    Lorraine and the Ladybugs

    This is my weekly production blog for Lorraine and the Ladybugs, my final project in the Film Animation BFA.

    ​Excel sheet with schedule, shot list, etc.

    Archives

    April 2025
    February 2025
    January 2025
    November 2024
    October 2024
    September 2024

    Categories

    All
    Backgrounds
    Pitch
    Pre Production
    Production
    Sound
    Story
    Timing

Proudly powered by Weebly
  • ⋆⭒˚.⋆ About Me ☆゚.*・。゚